homepage home
subscribe to California Construction magazine subscribe
newsletters free e-newsletter
advertise
industry jobs industry jobs
Mcgraw Hill Construction
California Construction Logo
Order Your RISK FREE Subscription
comment

California Firm Tapped to Irrigate Elk Refuge

Text size: A A

A California contractor was awarded one of the largest U.S. Fish and Wildlife Service American Recovery and Reinvestment Act contracts for a $5 million irrigation project in the National Elk Refuge near Jackson, Wyoming.

California Firm Tapped to Irrigate Elk Refuge
Photo Courtesy of Yerba Buena Engineering and Construction Inc.
California Firm Tapped to Irrigate Elk Refuge
----- Advertising -----

Yerba Buena Engineering and Construction, Inc. a San Francisco-based minority-owned small business will install more than 5 mi of irrigation pipe in the 25,000-acre park to replace what Fish and Wildlife Service spokesman Michael Mascari called “pioneer-era canals.”

Yerba Buena proposed using polyethylene pipe and small sprinklers. The raw materials are more expensive than polyvinyl chloride (PVC) pipe, but because of their flexibility, less expensive to install and more durable than the rigid alternative.

The K-Line irrigation system can be moved around by Fish and Wildlife employees as needed and eliminates the need for diesel-fueled pumps.

“This is a routine project except for the size and timeline,” says Yerba Buena Project Manager Lee Barrus.

Work must take place in the four months when the elk leave during the summer to graze and must be complete by the time they return in August. Barrus plans to employ 50 people, many through local subcontractors, to work in shifts to meet the aggressive deadline.

Yerba Buena worked on a similar Fish and Wildlife project a year ago when it installed a new water diversion at the Coleman National Fish Hatchery in Northern California. The company also has a contract with San Francisco Public Utilities Commission to maintain the aging Hetch Hetchy Water conveyance system.

The new irrigation system, funded by $4.3 million in ARRA dollars, will be more efficient, more aesthetically pleasing and create additional habitat.

Mascari called the project “environmentally significant.”

Elk on the refuge rely on a winter supplemental feeding program that concentrates the herd and increases potential for disease transmission. Increased natural food production from this irrigation project will reduce reliance on supplemental feeding and allow the elk to disperse to a larger area, reducing the potential for disease and save up to $1 million a year in feeding and $5,000 in pumping costs.

More than 7,000 elk make their home in the refuge during winter and 46 other mammals, including bison, and nearly 75 species of birds move through the park throughout the year. More than one million human visitors come to the refuge annually.  

The Elk Refuge project is one of $3 billion worth of ARRA projects funded through the Dept. of the Interior, $280 million of which will be funneled through the U.S. Fish and Wildlife Service.

----- Advertising -----
New Blog: Vertically Speaking in Northern California
New Blog: Field Notes
Reader Photos
Photos from California Construction Photo Showcase
Dodge Lead Center
Search for local construction projects OR CALL 877-234-4246 and get a FREE Lead Now!
Search by Project Type & State





----- Advertising -----
 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.