California Construction 2010 Top Project Starts

Text size: A A

 

California Construction 2010 Top Project Starts
Rank Name of Project Construction Valuation
($ Mil.)
1 UCSF Medical Center at Mission Bay, San Francisco
Owner: University of California, San Francisco
GC: DPR Construction Inc.
CM: Alfa Tech Cambridge Group
Architect: Anshen + Allen
Start Date: 2009 | Expected Completion Date: 4th Quarter/2013
Seeking LEED Certification: Yes, LEED gold
Description: With increased inpatient and outpatient demand, a new multidisciplinary campus is being built that combines a children’s hospital, comprehensive cancer center and women’s health center into a single complex.
$1,600.00
2 San Francisco General Hospital, San Francisco
Owner: City & County of San Francisco
GC: Webcor Builders, San Mateo
Architect: Fong & Chan Architects, San Francisco
Start Date: October 2009 | Expected Completion Date: March 2015
Seeking LEED Certification: Seeking LEED gold
Description: The 448,000-sq-ft steel moment frame structure, two levels below grade and eight levels above, includes a mechanical penthouse and 284 beds, 14 operating rooms and a Level-1 trauma care center.
$887.40
3 Kaiser Permanente Fontana Replacement Hospital, Fontana
Owner: Kaiser Permanente, Oakland
GC: McCarthy Building Companies, Inc., Newport Beach
Architect: HMC Architects, Ontario
Start Date: May 2009 | Expected Completion Date: Fall 2013
Seeking LEED Certification: No
Description: Project includes a 262-bed template hospital with operating rooms, imaging, labor and delivery rooms and emergency department bays, as well as a medical office building, utility plant and parking structure.
$700.00
4 San Diego Airport – Terminal 2 West Building / Airside Expansion, San Diego
Owner: San Diego Regional Airport Authority
GC: Turner/PCL Construction Services, Inc./Flatiron
Architect: HNTB
Start Date: July 2009 | Expected Completion Date: January 2013
Seeking LEED Certification: LEED silver under the LEED NC 2.2 rating system
Description: Expanded terminal will include 10 new boarding gates and revamped roadway system outside of the terminal on the airport’s west side, as well as additional restaurants and shops.
$470.00
5 Kaiser Permanente, Orange County Medical Center, Anaheim
Owner: Kaiser Permanente, Oakland
GC: Hensel Phelps Construction Company, Irvine
Architect: Cannon Design, Los Angeles
Start Date: May 2009 | Expected Completion Date: August 2012
Seeking LEED Certification: Parking structure is being built for LEED silver
Description: The seven-story, 314-bed, 482,000-sq-ft replacement hospital project also includes a 56,000-sq-ft support building as well as a 23,000-sq-ft central plant.
$350.00
6 CHOC Children’s Hospital Patient Care Tower II, Orange
Owner: CHOC Children’s, Orange
GC: McCarthy Building Companies, Inc., Newport Beach
CM: Jacobs, Cypress
Architect: FKP Architects, Houston
Start Date: September 1, 2009 | Expected Completion Date: December 2012
Seeking LEED Certification: No, but in response to the community and regional environment, the building incorporates environmental health principles and sustainable building guidelines
Description: The project entails construction of a new 425,000-sq-ft patient tower with one basement level and seven upper levels as well as a chiller room, penthouse and helistop.
$273.00
7 Solyndra, Front End Manufacturing Facility (phase I), Fremont
Owner: Solyndra, Inc, Fremont
GC: Rudolph and Sletten, Redwood City
CM: Aequitas Constructors, San Francisco
Architect: CH2M Hill, Portland, Oregon / STUDIOS Architecture, San Francisco
Start Date: September 2009 | Expected Completion Date: September 2010
Seeking LEED Certification: Yes, silver rating for office building
Description: Phase one of the new thin-film solar panel manufacturing facility will contain 609,000 sq ft of manufacturing plant floor area, utility and support space, shipping and receiving and office areas.
$240.00
8 Sutter Medical Center Castro Valley, Castro Valley
Owner: Sutter Health, Sacramento
GC: DPR Construction, Redwood City
CM: DPR Construction, Redwood City
Architect: Devenney Group, Phoenix
Start Date: June 2009 | Expected Completion Date: June 2012
Seeking LEED Certification: Yes, LEED NC 2.2 silver
Description: Construction consists of a seven-story, 230,000-sq-ft hospital providing 130 acute care beds and 34 beds for universal care service, an emergency department, trauma center, urgent care, OB and neurosciences.
$200.00
9 Defense Fuel Storage Facility, Naval Base Point Loma, San Diego
Owner: U.S. Naval Facilities Engineering Command, San Diego
GC: Nova Group, Inc./Underground Construction Co., Inc., a Joint Venture
CM: Nova Group, Inc./Underground Construction Co., Inc., a Joint Venture
Architect: Burns and McDonnell, Kansas City, MO
Start Date: March 2009 | Expected Completion Date: July 2012
Seeking LEED Certification: LEED silver
Description: Project will replace fuel storage tanks for the Navy at Defense Fuel Supply Point and will include multi-product fuel storage tanks, fuel distribution piping, pumphouse, fuel oil reclamation facilities and a lube oil storage and dispensing system.
175.00
10 Interstate 215-Segments 1 and 2, San Bernardino
Owner: San Bernardino Associated Governments, San Bernardino
GC: Skanska-Rados, A Joint Venture
CM: Jacobs, Cypress
Start Date: October 19, 2009 | Expected Completion Date: October 23, 2013
Seeking LEED Certification: No
Description: The project, located on I-215 from south of Rialto Avenue to north of SR-259, includes 17 new bridges, 20,800 lf of cast-in-place concrete retaining walls, 2,370 lf of mechanically stabilized embankment walls, 80,250 cy of concrete pavement and 88,600 tons of AC pavement.
$154.27
11 Methodist Hospital of Southern California Patient Tower, Arcadia
Owner: Methodist Hospital of Southern California, Arcadia
GC: McCarthy Building Companies, Newport Beach
CM: Jacobs Engineering, Pasadena
Architect: NTD Architecture, San Diego
Start Date: January 2009 | Expected Completion Date: October 2011
Seeking LEED Certification: The tower is not seeking third party certification for sustainability, but the design does bring nature indoors with open-air atriums, natural lighting and green spaces
Description: The 154,490-sq-ft project will include an emergency department on the first floor, a 20-bed ICU and pharmacy on the second floor, 40 medical/surgical beds each on the third, fourth and fifth floors, and support services on the basement level.
$140.47
12 San Francisco Public Utilities Commission Building, San Francisco
Owner: San Francisco Department of Public Works, Project Management Bureau GC/
CM: Webcor Builders, San Mateo
Architect: KMD Architects, San FranciscoAssociate
Architect: Stevens & Associates, San Francisco
Start Date: October 2009 | Expected Completion Date: April 2012
Seeking LEED Certification: This project is to exceed LEED platinum rating, making the PUC building one of the most sustainable urban office building in the country
Description: The new administration building for the SFPUC will consist of a 13-story, 277,000-sq-ft office tower with one subterranean level.
$140.00
13 Bachelor Enlisted Quarters, Package 5, Camp Pendleton
Owner: NAVFAC, San Diego
GC: Harper Construction Co., Inc., San Diego
Architect: Cass/Sowatsky/Chapman & Associates, San Diego
Start Date: December 2009 | Expected Completion Date: June 2011
Seeking LEED Certification: Yes, LEED platinum
Description: Design-build of four new bachelor enlisted quarters, including separate activity buildings and furniture, fixtures and equipment.
$137.60
14 BART Fremont Central Park Subway, Fremont
Owner: Bay Area Rapid Transit District, Oakland
GC: Shimmick/Skanska JV, Oakland
Start Date: August 2009 | Expected Completion Date: March 2013
Description: The construction contract includes a mile-long subway beneath Fremont Central Park, an embankment for future BART trackways, two ventilation structures and relocation of facilities within the park.
$136.75
15 Bachelor Enlisted Quarters, Package 1, Camp Pendleton
Owner: NAVFAC, San Diego
GC: Harper Construction Co., Inc., San Diego,
Architect: Cass/Sowatsky/Chapman & Associates, San Diego
Start Date: February 2009 | Expected Completion Date: November 2010
Seeking LEED Certification: Yes, LEED silver
Description: Design-build project consists of five new bachelor enlisted quarters, including separate activity buildings and furniture, fixtures and equipment.
$122.28
16 CSU Fullerton Student Housing Phase III, Fullerton
Owner: California State University, Fullerton
GC: PCL Construction Services, Inc., Glendale
Architect: Steinberg Architects, Los Angeles
Start Date: April 2009 | Expected Completion Date: July 2011
Seeking LEED Certification: Yes, LEED gold
Description: The scope of work consists of 1,056 residential beds in a double occupancy room configuration, distributed in five five-story buildings.
$121.00
17 California ISO Headquarters & Operating Center, Folsom
Owner: California Independent System Operator, Folsom
GC: Clark Design Build of California, Oakland
CM: Vanir Construction Management Inc., Sacramento
Architect: Dreyfuss & Blackford Architects, Sacramento
Start Date: April 2009 | Expected Completion Date: January 2011
Seeking LEED Certification: The project is on target for LEED gold certification
Description: The new 278,000-sq-ft building will include a renewable power education center and a smart grid lab to showcase high-tech ways to conserve energy and tap consumer-controlled demand response.
$110.00
18 John Wayne Airport Terminal C & Terminal A&B Improvements, Orange County
Owner: John Wayne Airport, Orange County. Located in an unincorporated area of the county, between Irvine, Newport Beach and Costa Mesa.
GC: McCarthy Building Companies, Inc., Newport Beach
CM: Arcadis/Pinnacle One, Irvine / PM: Parsons, Pasadena
Architect: Gensler, Newport Beach
Start Date: July 2009 | Expected Completion Date: August 2011
Seeking LEED Certification: No
Description: Project includes construction of a new three-level, 280,000-sq-ft terminal with six bridged aircraft gates and new facilities for commuter/regional jets.
$102.30
19 Department of Veteran Affairs Medical Center Expansion, Long Beach
Owner: Isabel Duff, Director, VA Medical Center, VA Long Beach Healthcare System, Long Beach/ Bob Clifton, Project Manager, VA Construction & Facilities Management, Vallejo
GC: S. J. Amoroso Construction Co., Inc., Costa Mesa
CM: Department of Veterans Affairs
Architect: Lee, Burkhart, Liu, Inc., Marina del Rey
Start Date: January 2009 | Expected Completion Date: June 2011
Seeking LEED Certification: Yes, LEED silver standards to meet the government requirements
Description: The 209,000-sq-ft expansion includes a 24-bed inpatient/outpatient blind rehabilitation center; an outpatient clinic, emergency department and pharmacy; and an educational resource and conference center.
$100.00
20 University of California at Berkeley Student Athlete High Performance Center, Berkeley
Owner: University of California at Berkeley
GC: Hunt Construction Group, San Francisco
CM: Hunt Construction Group, San Francisco
Architect: HNTB, Los Angeles
Start Date: January 2009 | Expected Completion Date: September 2011
Seeking LEED Certification: Yes, LEED certified
Description: A 140,000-sq-ft, two-story building on the west side of California Memorial Stadium will contain space for strength and conditioning training, team offices, conference and support spaces, laundry, video services and an academic center.
$95.00
21 Bachelor Enlisted Quarters, Package 6, Camp Pendleton
Owner: NAVFAC, San Diego
GC: Harper Construction Co., Inc., San Diego
Architect: Cass/Sowatsky/Chapman & Associates, San Diego
Start Date: December 2009 | Expected Completion Date: March 2011
Seeking LEED Certification: Yes, LEED platinum
Description: Design-build project includes three new bachelor enlisted quarters including activity buildings and furniture, fixtures and equipment.
$90.26
22 South Bay International Wastewater Treatment Plant, San Diego
Owner: International Boundary & Water Commission
GC: PCL Construction, Inc.
Start Date: January 2009 | Expected Completion Date: March 2011
Seeking LEED Certification: No
Description: The second phase build-out of the plant is designed to provide for an average daily flow of 25 million gallons per day.
$88.61
23 LAUSD South LA High School #3, Los Angeles
Owner: LAUSD, Los Angeles
GC: Clark Construction Group- California, LP, Costa Mesa
Architect: CSOA, Marina Del Ray
Start Date: June 2009 | Expected Completion Date: August 2011
Seeking LEED Certification: Project is built under CHPS standards
Description: Construction of a new high school includes a gym, classrooms, parking structure, central plant and a full-size athletic track and football field.
$86.00
24 Nursing and Science/Math Complex, Riverside Community College, Riverside
Owner: Riverside Community College District, Riverside
GC: Barnhart Balfour Beatty
CM: Barnhart Balfour Beatty
Architect: gkkworks, Irvine
Start Date: September 2009 | Expected Completion Date: September 2011
Description: Construction includes a 37,000-sq-ft, two-story nursing building and an 88,000-sq-ft, four-story science/math building, plus a cafe, healing garden and administrative offices.
$85.00
27 Tesla Treatment Facility, Tracy
Owner: San Francisco Public Utilities Commission, San Francisco
GC: PCL Civil Constructors, Inc., Tempe, Ariz.
Start Date: April 2009 | Expected Completion Date: November 2011
Seeking LEED Certification: Yes, LEED silver for the administration/operations building
Description: Project consists of a new 315 mgd treatment facility using ultra-violet disinfection and new chemical feed facilities.
$82.38
28 South Placer Adult Correctional Facility, Roseville
Owner: County of Placer, Auburn
GC: McCarthy Building Companies, Inc., Roseville
CM: Vanir, Sacramento
Architect: HDR, Sacramento
Start Date: August 2009 | Expected Completion Date: October 2011
Seeking LEED Certification: Yes, LEED silver
Description: The 191,000-sq-ft facility includes housing units for 390 inmates, food service, administrative offices, medical suite and site development to accommodate 142 stalls for parking.
$81.60
29 South Region High School #12, Los Angeles
Owner: Los Angeles Unified School District, Los Angeles
GC: Suffolk Construction, Irvine
CM: Los Angeles Unified School District, Los Angeles
Architect: MVE Institutional, Irvine
Start Date: September 2009 | Expected Completion Date: March 2012
Seeking LEED Certification: Yes, this project is certified by the Collaborative for High Performance Schools (CHPS)
Description: The new 2,025-student high school consists of 75 classrooms, divided into four small learning communities, as well as a library, gymnasium and multipurpose room.
$75.50
30 Providence Holy Cross Medical Center, Mission Hills
Owner: Providence Holy Cross
GC: Swinerton Builders, Orange County
Architect: HMC Architects
Start Date: May 2009 **Swinerton took over construction at 38% complete Expected Completion Date: December 2010
Seeking LEED Certification: No
Description: The hospital tower expansion is 120,000 sq ft spanning more than four floors and a basement (or garden level) and includes the remodel of the 11,000-sq-ft main entrance and food service/dining areas.
$75.00
31 UCSC Biomedical Sciences Facility, Santa Cruz
Owner: University of California at Santa Cruz
GC: Devcon Construction, Inc. Milpitas
Architect: EHDD Architect, San Francisco
Start Date: August 2009 | Expected Completion Date: November 2011
Seeking LEED Certification: Yes, LEED silver
Description: The project consists of a 94,700-sq-ft, four-story steel building with one story below grade constructed on two existing paved parking lots, located in the Science Hill area of the central campus.
$70.00
32 Marine Recruitment Barracks Complex, San Diego
Owner: NAVFAC, San Diego
GC: Harper Construction Co., Inc., San Diego
Architect: Cass/Sowatsky/Chapman & Associates, San Diego
Start Date: December 2009 | Expected Completion Date: June 2011
Seeking LEED Certification: Yes, LEED gold; green consultant is The Ecologic Studio
Description: Design-build construction of a physical conditioning recruit barracks, recruit training barracks, a sports medicine and reconditioning therapy clinic and furniture, fixtures and equipment.
$65.52
33 Temecula Civic Center, Temecula
Owner: City of Temecula
GC: Edge Construction, Escondito
Architect: Nichols, Melburg & Rossetto Architects, Redding
Start Date: February 2009 | Expected Completion Date: November 2010
Seeking LEED Certification: City Hall is scheduled for LEED gold
Description: Project consists of 100,000 sq ft of city offices and community rooms, a 450-space parking structure (with PV arrays on shade structures on the top level) and a community-focused civic plaza.
$65.00
34 San Bernardino Juvenile Detention and Assessment Facility, San Bernardino
Owner: County of San Bernardino
GC: Sundt Construction, San Diego
Architect: Arrington-Watkins Architects, Phoenix
Start Date: March 2009 | Expected Completion Date: March 2011
Seeking LEED Certification: No
Description: Project includes three 80-bed housing units and one 40-bed housing unit, classrooms, common areas, exercise areas, intake/booking, administration office, warehouse and kitchen.
$58.78
35 Soka University of America, New Performing Arts Center and Associated Academic Facilities, Aliso Viejo
Owner: Soka University of America, Aliso Viejo
GC: McCarthy Building Companies, Inc., Newport Beach
Architect: ZGF Architects LLP, Los Angeles
Start Date: January 2009 | Expected Completion Date: October 2010
Seeking LEED Certification: Registered for LEED-NC 2.2 gold
Description: Project includes a 48,000-sq-ft, 1,200-seat Performing Arts Center, and an adjacent four-level Academic Building with 11 classrooms, 29 faculty offices, 150-seat black-box theater and dressing rooms.
$57.00
36 UC San Diego Health Sciences Graduate Student Housing, La Jolla
Owner: University of California at San Diego
GC: Webcor Builders, San Mateo
Architect: Valerio Dewalt Train, Chicago
Start Date: March, 2009 | Expected Completion Date: December, 2010
Seeking LEED Certification: Yes, LEED silver
Description: Project, which will form the terminus to the future academic mall, consists of 225 two-bedroom units and one three-bedroom unit.
$56.25
37 Monarch Village Senior Housing, Daly City
Owner: American Senior Living, Santa Ana
GC: Nibbi Brothers General Contractors, San Francisco
Architect: GMPA Architects, Santa Monica
Start Date: February 2009 | Expected Completion Date: October 2010
Seeking LEED Certification: No
Description: The 208-unit, five-story building includes below-ground parking, kitchen, dining room, spa, fitness center and administrative offices all above a ground-floor, 15,000-sq-ft Walgreens.
$56.00
38 I-880/High Street Bridge Replacement, Oakland
Owner: Caltrans
GC: Flatiron
Start Date: November 2009 | Expected Completion Date: November 2011 or April 2012 (depending on weather)
Description: Scope of this Phase 2 Seismic Retrofit Program project is to remove and replace existing parallel bridges on I-880 over High Street. The existing structure is vulnerable to damage in the event of a major earthquake.
$50.65
39 Solyndra, Back End and Equipment Building, Fremont
Owner: Solyndra, Inc., Fremont
GC: Rudolph and Sletten, Redwood City
CM: Aequitas Constructors, San Francisco
Architect: CAS Architects, Inc., Mountain View
Start Date: September 2009 | Expected Completion Date: June 2010
Seeking LEED Certification: No
Description: Project is a 507,000-sq-ft facility built for equipment manufacturing, tool build and testing, with support offices on the first and second floors.
$50.00
----- Advertising -----
New Blog: Vertically Speaking in Northern California
New Blog: Field Notes
Reader Photos
Photos from California Construction Photo Showcase
----- Advertising -----
 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.