The Christian Brothers High School project was an exemplary
effort among contractorts, suppliers, architects and engineers,
all of whom donated their services.
The team, led by Panattoni Construction, built a two-story,
33,888-sq.-ft., steel-framed building to replace existing
overcrowded science labs and classrooms. E.M. Kado and Associates
designed the shell and Comstock Johnson Architects designed
the tenant improvement portion.
The entire project took just 15 months to construct. Within
that time frame, the tenant improvement phase was designed,
reviewed and permitted.
The new building is connected to the existing one at the
second floor by means of an enclosed walkway bridge. The facility
includes life sciences, physical sciences and chemistry laboratories,
seven classrooms, a faculty lounge and chemical storage room.
All classrooms are equipped with 120-in., drop-down projector
screens, recessed speakers, digital projectors, Crestron controls,
DVDs, VCRs, computer and document cameras.
Panattoni exceeded owner expectations by controlling costs
and scheduling and exhibiting superior teamwork.
Quotable:
Panattoni was very helpful in keeping a lid on costs on
what was a very complex and challenging project. They saved
us many thousands of dollars through their diligence and detailed
analysis of change orders and subcontractor bidding.
Mark L. Warren, president,
Christian Brothers High School
|
Christian Brothers
High School, Science, Math and Technology wings, Sacramento
Owner: Christian Brothers,
Sacramento
Architects: E.M. Kado
Associates, Comstock Johnson Architects
Construction manager:
Panattoni Construction Inc.
General contractor: Panattoni
Construction Inc.
Mechanical engineer: Turley
& Associates Mechanical Engineering Group
Entry submitted by: Panattoni
Construction Inc.
|
|